The Journal

When to choose your flooring during construction

By Akrruthi3 minute readUpdated 15 October 2026

Statuario, bright white ground with bold grey veining

The short answer

Choose your flooring stone before plastering starts, ideally while the structure is going up. Floor levels, door heights, skirting and staircase sizes depend on the stone's thickness, and good lots take time to find. Deciding at the last minute means choosing under pressure from what is in stock, after the budget is already spent.

Key takeaways

  • Decide the main flooring stone while the structure is going up, before plastering.
  • Levels, door heights and skirting depend on the stone's thickness.
  • Late decisions mean choosing under pressure from what is in stock.

Advice for you

Tell us who you are and we will show you what matters most in this guide.

I am building or renovating my home

Fix the flooring budget early and protect it. It is one of the few finishes you cannot change later without breaking the floor.

Book a visit to see full slabs

Why choose flooring early?

  • Levels: the floor finish decides the height of the screed, door frames, thresholds and the first stair riser.
  • Budget: flooring is one of the largest finishing costs. Fixing it early protects it from overruns elsewhere.
  • Lots: a large, consistent lot from one block is not always in stock on the day you need it.
  • Time: good slabs need to be chosen, tagged and delivered before the mason is booked.
  • Design: your architect can plan borders, inlays and vein direction only once the stone is known.

A simple timeline

When to decide each stone during construction
StageWhat to decide
Structure going upMain flooring stone, kitchen counter stone, staircase stone
Before plasteringFloor levels, door heights and skirting, using 18 mm slabs
Before electrical and plumbingBathroom stone and wall cladding, so fixtures sit right
Before flooring startsChoose and tag slabs; agree quantity and wastage
During layingLay slabs dry in order; check the bed and joints
After layingProtect the floor until other trades finish; then polish and seal

What goes wrong when flooring is decided late?

The most common problems we see come from late decisions: a stone chosen from a phone photo because there was no time to visit, a quantity that falls short and cannot be matched from the same lot, or a polished stone in a bathroom because the honed one was not ready. Late decisions also push families towards whatever is in stock, not what suits the room.

Which stones need the most lead time?

Bold Italian whites such as Statuario and Calacatta vary the most from block to block, so finding enough matching slabs takes longer. Calmer stones such as Botticino Classico and Crema Marfil are easier to match. Granite such as Absolute Black and natural stone such as Kota Blue are usually the quickest to plan. Coloured stones for borders, such as Nero Marquina, are small quantities but worth choosing early, because they decide the pattern.

What to do this week if you are building

  • Mark each room on your plan with the stone you want and its finish.
  • Work out a first quantity with the stone quantity calculator.
  • Visit with your architect or contractor and see full slabs.
  • Ask for the slabs to be tagged once you choose, and agree the delivery date with your mason's schedule.

Read how much stone you need to plan quantities and wastage before you order.

Stones in this guide

Tap the heart to add a stone to your shortlist, then compare them and book a viewing of exactly those slabs.

Questions people ask

Can I choose flooring after plastering?

Yes, but levels, door heights and skirting must already allow for the stone's thickness. Deciding earlier avoids chipping plaster or re-fixing frames.

How long does it take to choose stone?

Most families choose over two or three visits. Allow time for your architect or contractor to join one of them.

Should flooring be laid before or after painting?

Usually before the final coat of paint, with the floor protected. Polishing and sealing come at the end, after the messiest work is done.

What thickness should I plan levels for?

Akrruthi supplies 18 mm slabs. Add the thickness of the bed your mason uses; your contractor will confirm the finished level.

Ask an expert

Still deciding? Ask us about your rooms.

Leave your number and your question. Someone who selects stone every day will call you back, with an honest answer even if it is "not this stone".

Ask on WhatsApp instead

Read nextHow much stone do you need, and what wastage is normalMeasure each room's floor area, add an allowance for cutting wastage and breakage, and round up to whole slabs or tiles.

The 2026 Akrruthi catalogue

Every stone we hold, swatch by swatch, in one file to share with your family, architect or contractor.

Get the catalogue

Your shortlist

Tap the heart on any stone to save it here. Your shortlist stays on this device.

The 2026 Akrruthi catalogue

Every stone, swatch by swatch.

Tell us a little about your project. You can download it straight away, and we will email you a copy to share with your family, architect or contractor.

All fields are required. We use your details only to send the catalogue and help with your stone.